óóà?àà?à???à?à??ààààà???àóàóàà?ààà???àóóó


DATA ITEM DESCRIPTION

Title: MAJOR MILESTONE COMMONALITY AND CONFIGURATION VARIANC">

国产aaaa级全身裸体精油片_337p人体粉嫩久久久红粉影视_一区中文字幕在线观看_国产亚洲精品一区二区_欧美裸体男粗大1609_午夜亚洲激情电影av_黄色小说入口_日本精品久久久久中文字幕_少妇思春三a级_亚洲视频自拍偷拍

首頁 > 標(biāo)準(zhǔn)下載>NAVY DI-MGMT-82022-2016 Major Milestone Commonality And Configuration Variance Progress Report免費下載
NAVY DI-MGMT-82022-2016  Major Milestone Commonality And Configuration Variance Progress Report NAVY DI-MGMT-82022-2016  Major Milestone Commonality And Configuration Variance Progress Report

NAVY DI-MGMT-82022-2016 Major Milestone Commonality And Configuration Variance Progress Report

  • 標(biāo)準(zhǔn)類別:
  • 標(biāo)準(zhǔn)大小:
  • 標(biāo)準(zhǔn)編號:NAVY DI-MGMT-82022-2016
  • 標(biāo)準(zhǔn)狀態(tài):現(xiàn)行
  • 更新時間:2024-01-04
  • 下載次數(shù):
標(biāo)準(zhǔn)簡介

[第1頁] óóà?àà?à???à?à??ààààà???àóàóàà?ààà???àóóó DATA ITEM DESCRIPTION Title: MAJOR MILESTONE COMMONALITY AND CONFIGURATION VARIANCE PROGRESS REPORT Number: DI-MGMT-82022 Approval Date: 20160119 AMSC Number: N9623 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: SH Project Number: MGMT-2015-037 Applicable Forms: N/A Use/relationship: The Major Milestone Commonality and Configuration Variance Progress Commonality Plan. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation. Requirements: 2. Content. The Report shall contain Commonality Goals and Thresholds established at the beginning of the reporting period. 2.1 The Report shall contain historical and demonstrated progress tracked against Commonality Goals and Thresholds by ship work breakdown structure (SWBS) and shall specify the following information: a. The name and percentage of Systems and Systems Architectures reused from prior hulls of the same Program/Ship Class and Other Program/Ship Classes. b. The name and the percentage of Systems and Systems Architecture components/parts reused from Other Program/Ship Classes. c. The name and the percentage of Virtual Shelf Systems and Systems Architectures applied. d. The name and the percentage of Virtual Shelf Specifications and Standards Applied in Ship Specification/Design. ò?a?′ í?? í§-??3- Y±33?2? ?í?·° í§-??3-÷ Source: https://assist.dla.mil -- D ?o ·??w 2-? n?l? o ía ?? d 2e 1?d ?·: × 220 -?·??1 ??6 ±o -í 0??1 2- ?28 ???·|T ??·1 ±0: 2 ?5 ?e8Z è?éé ò±? o±? ??-?′?? ?e?êó??ó?ì eé?eê??è Check the source to verify that this is the current version before use. ò± ??°?±????·±2 ±? 2???±?μ·21 °??3·???? ?·??±?? ′·??2-? o?±3 ×?í [第2頁] DI-MGMT-82022 e. The name and the percentage of Virtual Shelf Equipment and Parts applied in Systems and Systems Architectures. f. The name and the percentage of Program-Unique Items. 2.2 The Report shall specify the number of Virtual Shelf Feedback Reports submitted by the contractor. 2.3 The Report shall include all technical and business case analyses for the Feedback reports specified in the Virtual Shelf. 2.4 The Report shall specify the estimated cost savings and cost avoidance information resulting from Commonality implementation. End of DI-MGMT-82022 2 ò?a?′ í?? í§-??3- Y±33?2? ?í?·° í§-??3-÷ Source: https://assist.dla.mil -- D ?o ·??w 2-? n?l? o ía ?? d 2e 1?d ?·: × 220 -?·??1 ??6 ±o -í 0??1 2- ?28 ???·|T ??·1 ±0: 2 ?5 ?e8Z è?éé ò±? o±? ??-?′?? ?e?êó??ó?ì eé?eê??è Check the source to verify that this is the current version before use. ò± ??°?±????·±2 ±? 2???±?μ·21 °??3·???? ?·??±?? ′·??2-? o?±3 ×?í óóà?àà?à???à?à??ààààà???àóàóàà?ààà???àóóó

標(biāo)準(zhǔn)截圖
下一條:返回列表
版權(quán):如無特殊注明,文章轉(zhuǎn)載自網(wǎng)絡(luò),侵權(quán)請聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習(xí)使用,務(wù)必24小時內(nèi)刪除。