CCS前端工程設(shè)計報告美國電力登山者CCS II項目一期(2012)CCS Front End Engineering & Design Report American Electric Power
- 資料類別:
- 資料大?。?/li>
- 資料編號:
- 資料狀態(tài):
- 更新時間:2021-09-09
- 下載次數(shù):次
資料簡介
本《前端工程和設(shè)計報告》綜合了有關(guān)全球CCS研究所的Mountaineer商業(yè)規(guī)模碳捕集與封存項目的部分非專有設(shè)計信息。該報告基于第一階段–項目定義階段中開發(fā)的初步設(shè)計信息,涵蓋了2010年2月1日至2011年9月30日期間。該報告包括以下方面的描述和/或討論:?美國能源部的清潔煤電倡議,總體項目和第一階段目標(biāo),以及美國能源部和美國電力公司(AEP)贊助的項目的歷史演變,最終導(dǎo)致了當(dāng)前項目; ?阿爾斯通的冷氨法(CAP)碳捕集改造技術(shù)以及碳存儲和監(jiān)測系統(tǒng); ?AEP在工廠運(yùn)營和集成理念方面的改造方法; ?CAP技術(shù)的工藝島設(shè)備和工廠系統(tǒng)的平衡; ?碳儲存系統(tǒng),用于注水井,監(jiān)測井,系統(tǒng)監(jiān)測和控制邏輯原理; ?總體項目估算,包括隔夜成本估算,未來年度支出的成本升級以及主要因素,這些風(fēng)險是基于風(fēng)險的突發(fā)事件的發(fā)展因素; ?AEP決定在第一階段結(jié)束時中止該項目的進(jìn)一步工作,盡管它評估了阿爾斯通CAP技術(shù)已準(zhǔn)備好按預(yù)期規(guī)模進(jìn)行商業(yè)演示。
This Front End Engineering & Design Report consolidates select nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project for Global CCS Institute. The report is based on the preliminary design information developed during the Phase I – Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: ? US DOE’s Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; ? Alstom’s Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; ? AEP’s retrofit approach in terms of plant operational and integration philosophy; ? The process island equipment and balance of plant systems for the CAP technology; ? The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; ? Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and ? AEP’s decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.
資料截圖
版權(quán):如無特殊注明,文章轉(zhuǎn)載自網(wǎng)絡(luò),侵權(quán)請聯(lián)系cnmhg168#163.com刪除!文件均為網(wǎng)友上傳,僅供研究和學(xué)習(xí)使用,務(wù)必24小時內(nèi)刪除。
熱門推薦
-
石油化工自動控制設(shè)計手冊(第四版) 黃步余 化工出版社 2020年 2021-09-09
-
化工裝置實用操作技術(shù)指南 韓文光2001年化學(xué)工業(yè)出版社 2021-09-09
-
HAZOP分析方法及實踐 粟鎮(zhèn)宇 化學(xué)工業(yè)出版社2018年 2021-09-09
-
工業(yè)除塵設(shè)備設(shè)計手冊 張殿印 申麗 化工出版社 2012年 2021-09-09
-
加拿大煤炭開采Coal Mining in Canada 2021-09-09
-
化工節(jié)能技術(shù)手冊 王文堂 2006年化學(xué)工業(yè)出版社 2021-09-09
-
年終總結(jié)新年計劃工作匯報PPT模板 2021-09-09
